Business Intelligence Developer
Estithmar Holding
وصف الوظيفة
Role Overview
Business Intelligence Developer at Estithmar Holding. The role designs, builds and maintains BI reporting across multiple platforms to present EPMO performance to Group executive leadership, delivery directors and project teams.
Role Purpose
To replace manually assembled slide packs and spreadsheet trackers with a consistent, governed and automated reporting suite. The position turns validated project, cost, schedule, commercial and procurement data into dashboards, executive reports and self-service analytics that answer the questions decision makers actually ask. Every figure presented to leadership must be current, consistent from one report to the next, and traceable to its source.
Key Responsibilities
Project Assurance
- Form and maintain an independent view of progress, schedule and cost to complete on each allocated project, tested against source evidence and not against reported status.
- Run stage gate and monthly reviews for projects at the check it tier, and record decisions, owners and dates.
- Validate baselines, critical path, float movement and resource loading, working with the Risk and Schedule Analyst.
Recovery and Intervention
- Sit with projects at the run it tier, own the recovery plan, and close actions daily with named owners until the project is stable.
- Establish the real cause of delay or overrun, and flag the commercial consequence to Commercial Assurance early.
- Hand a stabilised project back to the reporting system and move to the next project that needs a person.
Escalation and Accountability
- Hold Project Directors, entity COOs and managing contractors to agreed actions and dates, and escalate immediately and with evidence when they are missed, without waiting for the next reporting cycle.
- Escalate delegation of authority and signatory findings as soon as they surface.
- Represent the EPMO in delivery review forums, so that every level of leadership hears the same position.
Data Integrity and Governance
- Draw delivery data from the governed model for the group pack, with no private spreadsheets or parallel versions.
- Capture lessons from each recovery and add them to the EPMO playbook.
- Check every AI output against the source before it reaches a Director or a forum.
AI Application
- Demonstrate genuine, demonstrated use of AI as a core working tool, evidenced by specific real examples from your own work. General awareness of tools or use limited to drafting and presentation polish does not meet the standard.
- Describe a real instance of using AI to spot delay risk earlier, accelerate root cause analysis or shape a recovery plan, not a hypothetical.
- Direct or work with technical colleagues to build AI assisted tools for schedule and delivery analysis, without needing to be a developer.
- Compare each programme update against baseline and prior periods to find float loss, changed logic and tasks slipping without being reported.
- Read site reports, minutes and correspondence at volume and test them against reported progress.
- Spot the same contractor, package or interface failing across more than one project.
Qualifications & Experience
- 10 to 15 years in major projects delivery, ideally in a main contractor, PMO or client side delivery assurance function, with genuine construction or major infrastructure experience.
- Taken a project in trouble and brought it back, and able to articulate what you personally did.
- Track record of holding senior stakeholders, at CEO, COO and Project Director level, to account in a forum and not only in writing.
- Gulf or wider MENA experience strongly preferred, including holding company to subsidiary delivery chains.
- Bachelor's Degree in any related field or any Related Technical Certificates.
- Master's degree in any related field or any Related Technical Certificates.
Skills & Competencies
- Fluent in the construction delivery lifecycle: mobilisation, design freeze, procurement, execution, testing and commissioning, handover and defects liability.
- Able to read a project programme in Primavera P6 or equivalent and tell genuine critical path slippage from float erosion or a reporting artefact.
- Understand the difference between delay caused by contractor underperformance, design or IFC delay, procurement or payment blockage, and client side or force majeure factors, and substantiate which applies from the paper trail and not just the narrative in a meeting.
- Comfortable with main contractor and subcontractor chains, including where both sit in the same group.
- Understand what a genuine contractual notice or dispute escalation looks like against routine correspondence.
- Strong presence, able to hold your own in a room with subsidiary CEOs without EPMO leadership needing to run interference.
- Persistent, and comfortable being the person who says an item is not actually closed when the room wants to move on.
- Firm but not confrontational by default. Credibility comes from accuracy and not volume. Ask what changed since last time, and do not accept a restated status.
- Agility.
- AI Fluency.
- Boldness.
- Build High-Performing Teams.
- Business Intelligence Tools L4.
- Business understanding and KPI Analysis L4.
- Data Visualization Skill L4.
- Leadership.
- Provide Direction.
- Quality.
- Quantitative Analysis L4.
- Requirement Gathering L4.